| Crane Pick Plan | A crane pick plan is a lift plan focused on a specific crane pick or sequence of picks. | Construction Administration |
| Lift Plan | A lift plan defines how a crane or lifting operation will be performed safely. | Construction Administration |
| Rated Load | Rated load is the maximum load equipment or a component is designed to safely carry. | Specifications & Standards |
| Rigging | Rigging is the equipment and method used to lift, secure, and move loads. | Construction Administration |
| Safety Factor | A safety factor compares the strength of a material or system to the load it is expected to carry. | Specifications & Standards |