Submittal Log Template

A submittal log converts specification requirements into a working review schedule for procurement and construction.

Recommended fields

FieldPurpose
Specification sectionTies the submittal to the contract requirement.
Submittal packageNames the product, system, or drawing package being reviewed.
Responsible partyIdentifies the subcontractor, supplier, or contractor owner.
Required on site dateConnects review timing to procurement and installation.
Review statusTracks whether the item is approved, rejected, or being revised.
RevisionSeparates original submissions from resubmittals.

Usage notes

  • Build the log from Division 01 and technical specification sections.
  • Back-schedule from procurement lead times.
  • Track rejected and revise-and-resubmit items separately.